Project Staff Experience And Resumes

David Rakszawski of C & C Construction Management Inc. based in Philadelphia
ROBERT MOSER Field Operations

C & C Construction Management Inc., 1990 – Present

PROFILE
Responsibilities overseeing all aspects of the project:
  • Maintain schedule & budget
  • Coordination and layout with all trade subcontractors
  • Arranging all field inspections with local authorities
  • Coordination of third-party quality control engineers
  • Ensuring the safety & compliance of the site
EDUCATION
OSHA 30, 2015 Carpentry Apprenticeship Program 1981 – 1986

PROFESSIONAL EXPERIENCE

Heartis Senior Living – Warminster, PA (162,000 SQFT)
New construction of a 4-story wood framed independent living building and a 3-story metal framed/poured concrete deck assisted living/memory care building.

The Atrium at Navesink Harbor – Red Bank, NJ (Received 50th annual NJ concrete merit award)
Construction of a new 8-story cast-in-place addition to an existing 14-story concrete tower. The project used a 6,000 psi concrete mix with mid-range plasticizer to achieve a pumpable mix with outstanding break results. Concrete maturity testing was employed to evaluate in-place concrete strength for the structural floors that were placed during cold weather months.

Winchester Gardens, Maplewood, NJ (72,362 SQFT)
Multi-phased renovation and addition to an existing occupied facility. Scope includes independent living, assisted living and common areas.

Manchester Senior Housing HMFA #02941 – Whiting, NJ (60,128 SQFT)
Interior Renovations to existing apartments and Common Areas.

Foothill Acres Nursing & Rehabilitation Center – Hillsborough, NJ
New 2-Story, 108,000 sqft 240-Bed Healthcare Center

The Oaks At Tom’s River – Toms River, NJ
New 3-Story, 85 Unit Senior Housing Facility

Stafford by the Bay – Manahawkin, NJ
New 70,000 sqft 3-Story Senior Housing Facility

Sean Crowley of C & C Construction Management in Philadelphia
SEAN CROWLEY Operations Manager

C & C Construction Management Inc., 2003 – Present

PROFILE

Responsibilities include:
•      Managing office support project engineer team & all field Project Managers & Superintendents
•      Assuring company policies & procedures are being followed including:
               o Budget Control
               o Planning
               o Scheduling
               o Quality Control
               o Safety

EDUCATION

Temple University, 2002, Construction Engineering
Proficient in AutoCAD, Expedition and Primavera

PROFESSIONAL EXPERIENCE

Cibao Meats – Rockaway, NJ New construction and renovation for new meat processing facility. Including cooler, freezer and oven construction Heartis Senior Living – Warminster, PA (162,000 SQFT) New construction of a 4-story wood framed independent living building and a 3-story metal framed/poured concrete deck assisted living/memory care building. 1830 Rittenhouse Square, Philadelphia, PA Demolition of exterior balconies on the east elevation and replacing the existing concrete on metal deck with metal galvanized grating. Winchester Gardens, Maplewood, NJ Multi-phased project consisting of new assisted living additions, renovations to the existing healthcare, independent living apartments and common areas Manchester Senior Housing HMFA #02941 – Whiting, NJ Interior Renovations to existing apartments and Common Areas The Atrium at Navesink Harbor – Red Bank, NJ (Received 50th annual NJ concrete merit award) Construction of a new 8-story cast-in-place addition to an existing 14-story concrete tower. The project used a 6,000 psi concrete mix with mid-range plasticizer to achieve a pumpable mix with outstanding break results. Concrete maturity testing was employed to evaluate in-place concrete strength for the structural floors that were placed during cold weather months. Foothill Acres Nursing & Rehabilitation Center – Hillsborough, NJ New 2-Story, 108,000 S.F. 240-Bed Healthcare Center Gloucester Manor Healthcare – Sewell, NJ Renovations of an occupied 67,000 SF long-term care facility maintain bed count to preserve revenue
David Rakszawski of C & C Construction Management Inc. based in Philadelphia
VINCENT CELENZA JR. Project Manager
C & C Construction Management Inc., 2016 – Present
PROFILE

Responsibilities include: 

  • Managing office support project engineer team & all field Project Managers & Superintendents 
  • Assuring company policies & procedures are being followed including:
    • Budget Control 
    • Planning 
    • Scheduling
    • Quality Control
    • Safety
EDUCATION
Drexel University, 2016, Bachelor’s Degree in Business w/Marketing concentration and Minor in Entrepreneurship and Innovation
  • Silica Awareness, 2019
  • Asbestos Awareness, 2019
  • Fall Protection, 2019
  • PROFICIENT IN

    • Procore • Submittal Exchange • Microsoft Project • Bluebeam • Primavera

    PROFESSIONAL EXPERIENCE

    Heartis Senior Living – Warminster, PA (162,000 SQFT)
    New construction of a 4-story wood framed independent living building and a 3-story metal framed/poured concrete deck assisted living/memory care building.

    Manalapan Senior Living – Manalapan, NJ
    Construction of 57,775 square feet one story assisted living facility. The assisted living facility will contain 60 residential units, common spaces and amenity spaces.

    1830 Rittenhouse Square, Philadelphia, PA
    Demolition of exterior balconies on the east elevation and replacing the existing concrete on metal deck with metal galvanized grating.

    Winchester Gardens, Maplewood, NJ
    Multi-phased project consisting of new assisted living additions, renovations to the existing healthcare, independent living apartments and common areas

    Manchester Senior Housing HMFA #02941 – Whiting, NJ
    Interior Renovations to existing apartments and Common Areas

    Wiley Christian Retirement Community – Marlton, NJ
    Renovations to existing apartments and healthcare facility

    The Atrium at Navesink Harbor – Red Bank, NJ (Received 50th annual NJ concrete merit award)
    Construction of a new 8-story cast-in-place addition to an existing 14-story concrete tower. The project used a 6,000 psi concrete mix with mid-range plasticizer to achieve a pumpable mix with outstanding break results. Concrete maturity testing was employed to evaluate in-place concrete strength for the structural floors that were placed during cold weather months.

    Foothill Acres Nursing & Rehabilitation Center – Hillsborough, NJ
    New 2-Story, 108,000 S.F. 240-Bed Healthcare Center

    Medford Leas – Medford, NJ
    New addition to the Community Building
    Interior renovations and alterations to the Atrium, Reception area and the Gift Shop

    Meadow Lakes Skilled Nursing Center – Hightstown, NJ
    Additions and interior renovations to an existing skilled nursing center (multi-phased project)

    Crestwood Manor – Whiting, NJ
    New Amenity addition and renovations including Café, Library, Billiards Room and Natatorium

    Monmouth Care Center – Long Branch, NJ
    Multi-phased project including additions and renovations to an occupied healthcare facility and renovating of kitchen while in operation.

    Gloucester Manor Healthcare – Sewell, NJ
    Renovations of an occupied 67,000 SF long-term care facility maintain bed count to preserve revenue

    Manchester Senior Housing – Whiting, NJ
    3 story, 68,121 SF Senior Housing Complex

     

    David Rakszawski of C & C Construction Management Inc. based in Philadelphia
    STEVE MIRARCHI Senior Project Manager

    C & C Construction Management Inc., 2016 – Present

    PROFILE

    Responsibilities include
    •      Assisting estimating team with descoping and awarding of contracts to subcontractors
    •      Creating and maintaining project schedule and budget
    •      Managing project scope and changes
    •      Setting goals and tracking project performance
    •      Developing comprehensive logistics plans
    •      Managing resources to achieve project objectives
    •      Providing project status reports and updates
    •      Documenting meeting minutes for subcontractor and owner meetings
    •      Coordinating bi-weekly project meetings with owners/design team and documenting meeting
    minutes

    EDUCATION

    • CHC Certified Healthcare Constructor, January 2019
    • Silica Awareness, 2019
    • Asbestos Awareness, 2019
    • Fall Protection, 2019
    • 30-Hour OSHA Training, March 2015
    • Mold Prevention and Awareness Training Certificate, January 2012
    • Temple University, BS Construction Management 2011

    PROFICIENT IN

    • Procore
    • Submittal Exchange
    • Microsoft Project
    • Bluebeam
    • Primavera

    PROFESSIONAL EXPERIENCE

    Heartis Senior Living – Warminster, PA (162,000 SQFT)
    New construction of a 4-story wood framed independent living building and a 3-story metal framed/poured concrete deck assisted living/memory care building.

    Medford Leas
    Extensive renovations to the occupied healthcare center. Multi-phased interior renovations including Wellness Center, exam rooms, PT/OT suite, pharmacy, salon, coffee shop, staff locker rooms and staff break areas.

    1830 Rittenhouse Square – Philadelphia, PA
    Demolition of exterior balconies on the east elevation and replacing the existing concrete on metal deck with metal galvanized grating.

    Renaissance Health Care & Rehabilitation Center
    Interior alteration to occupied nursing home

    Brookside Nursing & Rehabilitation Center – Roslyn, PA
    Addition and renovations to existing healthcare facility

    David Rakszawski of C & C Construction Management Inc. based in Philadelphia
    GARY GRISAFI Safety Manager
    C & C Construction Management Inc., 2008 – Present
    PROFILE

    Responsibilities include: 

  • Responsible for compliance of OSHA regulations practiced by C & C Construction Management Inc. and its Sub-Contractors which include: Journeymen, Plumbers, Excavators, Insulators, Electricians, Demolition, Roofers and all Sub-Contractors
  • Write inspection reports and accident/incident, fatality investigation reports, toolbox talks and training.
  • Author of C & C Safety Manual
  • EDUCATION

    Proficient in Microsoft Project, Expedition, Procore and Primavera

    CERTIFICATES & TRAINING

    COVID-19: Certificate in Preparing Workplaces for COVID-19 –OSHAcademy, May,

    2020Mass Climber: Safety and Operation trained, Northeast Mast Climbers, 2019

    Certificate to meet requirements of 29 CFR 1926.500 Subpart M, Fall Protection – Med Tex Services, May 2019

    OSHA 500 course, Mid Atlantic OTI Education Center, 2019, authorized OSHA instructor

    OSHA 510 course, Mid Atlantic OTI Education Center, 2018

    Safety Training: OSHA (OCCUPATION SAFETY AND HEALTH) – 10 Hour Construction Course. Philadelphia L&I & Mid Atlantic Construction Safety Council, 2016

    Certificate to meet requirements of 29 CFR 1926 Subpart M, Fall Protection – Med Tex Services, May, 2012

    Certificate on Competent Person for Fall Protection Equipment Inspection – Med Tex Services and MSA, June, 2009

    Certificate in Safety Inspections 10 hour course– National Safety Council (Chesapeake Region Safety Council) February, 2009

    Safety Training: OSHA (OCCUPATION SAFETY AND HEALTH) – 30 Hour Construction Course. Mid Atlantic Construction Safety Council, 2008

    Certificate on OSHA 300 Record keeping – OSHA Academy Safety Training Network, August, 2008.

    Certificate on Introduction to Safety Management – OSHA Academy Safety Training Network, July, 2008

    Certificate on Effective Accident Investigation – OSHA Academy Safety Training Network, July, 2008

    Certificate on Conducting a Job Hazard Analysis (JHA) – OSHA Academy Safety Training Network, July, 2008

    Online Excavation Competent Person Class – Construction Safety Council, May 2008.

    Certificate on Personal Protection Equipment – course ID – FFCS_SH021 – Learning Management Express, June 2008

    Safety Training: OSHA (OCCUPATION SAFETY AND HEALTH) – 30 Hour Construction Course at GBCA. 1998

    Certificate on Confined Space Entry per OSHA CFR – 1910 – 146 requirements. Instructed by “Industrial Safety Products” May 1998

    Trained and Certified, completing a program on the Operation of Aerial Lifts (Train the Trainer for AWP Safety) 1998

    Frank Stoltz Director of Project Development
    CHARLIE GRIFFIN BIM Coordinator & Assistant Project Manager

    C & C Construction Management Inc., 2020 – Present

    PROFILE
    Responsibilities in BIM Management:
    • Coordinate with onsite staff on model information
    • Facilitate delivery of MEP trade 3D models with BIM data
    • Conduct model validation checking to resolve unforeseen issues
    • Create high detail architectural visualizations that represent future projects
    Responsibilities overseeing all aspects of the project:
    • Maintain schedule & budget
    • Coordination and layout with all trade subcontractors
    • Arranging all field inspections with local authorities
    • Coordination of third-party quality control engineers
    • Ensuring the safety & compliance of the site
    EDUCATION
    OSHA 30, 2019 Project Management BS – Thomas Jefferson University

    PROFESSIONAL EXPERIENCE

    Cibao Meats – Rockaway, NJ
    BIM coordination and planning of steel work and MEP’s

    Brightside Manor – Teaneck, NJ
    Generated a BIM coordination model including architectural and MEP systems.

    Manalapan Assisted Living – Manalapan, NJ
    Generated an architectural visualization model displaying the completed building in high detail before the start of construction

    Advanced Subacute – Sewell, NJ
    Generated an architectural visualization model displaying the completed addition while representing the existing building and their adhesion

    Crane’s Mill – West Caldwell, NJ
    Oversee renovations to the existing lobby, corridors and common areas