Company Information
C & C Construction Management Inc., founded in 1990 has been in business over the years and has grown into a versatile construction management and general contracting firm, specializing and solely dedicated to the senior living market including Independent Living, Assisted Living, Memory Care, Skilled Nursing, Rehabilitation and Affordable housing.
C & C Construction Management., Inc. is licensed to do business in Pennsylvania, New Jersey and Delaware We have successfully completed over 250 projects in the Skilled Nursing and Senior Living markets from add-a-bed programs to developing single and multi-story campuses over 250,000 s.f.
Cost Proposal
Click to download PDF versions
- Once the budget has been established, we will review all quotes for each CSI division to ensure each bid is an accurate and a responsible quote. After the contractor selection is made a log will be created to track any buyouts. These buyouts may be used to cover any excess costs from other CSI divisions.
- Allowances will be tracked on a separate log showing any costs applied to these allowances. A log will be submitted with each application for payment.
- In our experience we believe the construction contingency should be held until the certificate of occupancy is issued. These contingencies will be used throughout the project to cover any commodity increases, unforeseen construction issues not clearly indicated on the contract drawings and final inspections which could lead to interpretations of the code with the building officials. During the project we will notify the Owner of any use of the contingency and a log tracking these costs will be submitted monthly with the application for payment.
- Our view is that if we are involved through the preconstruction process, we stand behind our price, therefore unless there are owner directed scope changes, there should be no change orders.
Questions & Answers
1. Please describe your firm’s philosophy on the sharing of savings from the G.M.P. The base proposal and proposed Agreement indicate all savings are returned to the Owner. If you support this approach, please indicate why. If you prefer to propose that the CM and Owner share savings, please provide an explanation as to why and how it would affect each of the elements of Controllable Margin and Contingency requested by this RFP.
2. Provide all material comments or observations to the draft Construction Contract. Clearly outline all proposed changes to the agreement. Substantial changes may cause your proposal to be rejected. We expect that the Owner will sign a Letter of Intent for pre- construction services shortly after the selection of a Contractor.
3. Provide a summary of any current claims, disputes, or litigation that your firm may be involved with. Include a summary of any such items, even if they are resolved since 2018.
We do not have any.
4. Identify if your company provides Sub-Guard insurance.
We do not provide sub-guard insurance since we would provide 100% performance bond.
5. Specifically identify the work that your firm would propose to self-perform.
Selective demolition, temporary barricades, signage, protective stanchions, air scrubbers and miscellaneous carpentry including touch up caulk, grout, paint etc related to Quality Control, close out and final turn over.
C & C Organizational Charts
Click the button to view Orginzational Phase.
Pre-Construction Phase Team
Construction Phase Team
Pre-Construction Staff Experience And Resumes
C & C Construction Management Inc., 2003 – Present
Responsibilities include:
• Managing office support project engineer team & all field Project Managers & Superintendents
• Assuring company policies & procedures are being followed including:
o Budget Control
o Planning
o Scheduling
o Quality Control
o Safety
Temple University, 2002, Construction Engineering
Proficient in AutoCAD, Expedition and Primavera
PROFESSIONAL EXPERIENCE
West Orange Apartments – West Orange, NJ
Construction of a 5 story mid rise consisting of (65) affordable house and on-site parking lot
Medford Leas Multiple Phased Project – Medford, NJ
New additions and repositing of existing campus totaling 120,000 S.F.
Crane’s Mill Town Center Porte Cochere & Façade Renovations- West Caldwell, NJ
Renovations to the Porte cochere & facade
Teaneck Road Senior Housing Project – Teaneck, NJ
Construction of 40 new units of affordable housing and on-site parking garage
Bright Side Manor – Teaneck, NJ
Construction of new two-story addition on the southern portion of the site along with minor renovations to existing building
Manalapan Senior Living – Manalapan, NJ
New ground up, 80 residential units. Including (3) households, common spaces and amenities
Heartis – Senior. Living. – Warminster, PA
Construction of 162,000 square foot of independent living, assisted living and memory care apartments. The community will feature large, secured courtyards and walking paths; beautifully landscaped grounds and gardens; game and activity rooms; a large dining room serving chef-prepared, home-cooked meals; ongoing social and recreational activities; a beauty parlor and barber shop; relaxing common areas; & luxurious finishes.
1830 Rittenhouse Square, Philadelphia, PA
Demolition of exterior balconies on the east elevation and replacing the existing concrete on metal deck with metal galvanized grating.
Advanced Subacute Care & Rehabilitation Center – Sewell, NJ
Demolition of (3) existing wings and construction of (3) new wings totaling 36,000-square-feet. The new building includes new resident rooms, PT/OT Suites, new nurses station, dining rooms, day room, and (2) new building entrances.
Winchester Gardens, Maplewood, NJ
Multi-phased project consisting of new assisted living additions, renovations to the existing healthcare, independent living apartments and common areas
Renaissance Healthcare – Philadelphia, PA
Interior alteration to occupied nursing home
Manchester Senior Housing HMFA #02941 – Whiting, NJ
Interior Renovations to existing apartments and Common Areas
Brookside Nursing & Rehabilitation Center – Roslyn, PA
Addition and renovations to existing healthcare facility
Wiley Christian Retirement Community – Marlton, NJ
Renovations to existing apartments and healthcare facility
The Atrium at Navesink Harbor – Red Bank, NJ
Construction of a new 8-story Senior Living Community, including renovations of the existing 14-story tower
Foothill Acres Nursing & Rehabilitation Center – Hillsborough, NJ
New 2-Story, 108,000 S.F. 240-Bed Healthcare Center
C & C Construction Management Inc., 2016 – Present
Director of Project Development at C&C Construction Management with experience in conceptual/design
development estimating and an expertise in sustainable construction.
Pennsylvania State University
B.S., Structural Design and Construction Engineering, May 1999
PROFESSIONAL EXPERIENCE
C&C Construction Management – Philadelphia, PA Senior Estimator – 2016 to Current
• Oversee Estimating Department • Manage Pre-Construction Process from Conceptual through Final Design o Develop Conceptual and Schematic Estimates Utilizing Historical/Benchmark Cost Data o Solicit Pricing for and Coordinate Site Surveys – Geotech, Haz. Mat., Utility Mark Out o Coordinate Investigative Work o Produce Design Development and Final Construction Estimates o Perform Constructability Reviews o Compile Value Engineering List for Owner/Design Team Consideration o Prepare Construction Schedules o Schedule/Attend Design Coordination Meetings o Prepare Logistics/Phasing Plans Dale Corporation – Glenside, PA Senior Estimator 2008 to 2016 • Lead Estimator on the Following notable Awarded Projects: o Residential Projects • Queen Lane Redevelopment – $20M • Strawberry Mansion and Oakdale Street Redevelopment – $22M • UFAS Renovations at (4) Sites – $30M o Commercial Projects • Dining Hall at Rosemont College – $3.8M • Addition and Renovation at the King of Prussia Mall – $17M • PHA Office Fit-Out – $4M • Completed LEED and Passive House Certification Cost Estimates for Projects- Creating and maintaining project schedule and budget
- Managing project scope and changes
- Setting goals and tracking project performance
- Developing comprehensive logistics plans
- Managing resources to achieve project objectives
- Providing project status reports and updates
- Documenting meeting minutes for subcontractor and owner meetings
- Coordinating bi-weekly project meetings with owners/design team and documenting meeting minutes
PROFESSIONAL EXPERIENCE
West Orange Apartments – West Orange, NJ
Construction of a 5 story mid rise consisting of (65) affordable house and on-site parking lot
Crane’s Mill Town Center Porte Cochere & Façade Renovations- West Caldwell, NJ
Renovations to the Porte cochere & facade
Medford Leas Multiple Phased Project – Medford, NJ
New additions and repositing of existing campus totaling 120,000 S.F.
Teaneck Road Senior Housing Project – Teaneck, NJ
Construction of 40 new units of affordable housing and on-site parking garage
Bright Side Manor – Teaneck, NJ
Construction of new two-story addition on the southern portion of the site along with minor renovations to existing building
Princeton Community Village – Princeton, NJ
New (3) story affordable family apartment units
Heartis – Senior. Living. – Warminster, PA
Construction of 162,000 square foot of independent living, assisted living and memory care apartments. The community will feature large, secured courtyards and walking paths; beautifully landscaped grounds and gardens; game and activity rooms; a large dining room serving chef-prepared, home-cooked meals; ongoing social and recreational activities; a beauty parlor and barber shop; relaxing common areas; & luxurious finishes.
Manalapan Senior Living – Manalapan, NJ
Construction of 57,775 square foot one story assisted living facility. The assisted living facility will contain 60 residential units, common spaces and amenity spaces.
1830 Rittenhouse Square, Philadelphia, PA
Demolition of exterior balconies on the east elevation and replacing the existing concrete on metal deck with metal galvanized grating.
Winchester Gardens, Maplewood, NJ
Multi-phased project consisting of new assisted living additions, renovations to the existing healthcare, independent living apartments and common areas
Renaissance Healthcare – Philadelphia, PA
Interior alteration to occupied nursing home
Manchester Senior Housing HMFA #02941 – Whiting, NJ
Interior Renovations to existing apartments and Common Areas
Brookside Nursing & Rehabilitation Center – Roslyn, PA
Addition and renovations to existing healthcare facility
Wiley Christian Retirement Community – Marlton, NJ
Renovations to existing apartments and healthcare facility
Daughters of Israel – West Orange, NJ
Renovations to occupied facility
C & C Construction Management Inc., 2018 – Present
The Estimator position prepares work to be estimated by gathering proposals, blueprints, specifications, and related documents. Identifies labor, material, and time requirements by studying proposals, blueprints, specifications, and related documents.
PROFESSIONAL EXPERIENCE
Project Staff Experience And Resumes
C & C Construction Management Inc., 2003 – Present
Responsibilities include:
• Managing office support project engineer team & all field Project Managers & Superintendents
• Assuring company policies & procedures are being followed including:
o Budget Control
o Planning
o Scheduling
o Quality Control
o Safety
Temple University, 2002, Construction Engineering
Proficient in AutoCAD, Expedition and Primavera
PROFESSIONAL EXPERIENCE
- Creating and maintaining project schedule and budget
- Managing project scope and changes
- Setting goals and tracking project performance
- Developing comprehensive logistics plans
- Managing resources to achieve project objectives
- Providing project status reports and updates
- Documenting meeting minutes for subcontractor and owner meetings
- Coordinating bi-weekly project meetings with owners/design team and documenting meeting minutes
PROFESSIONAL EXPERIENCE
West Orange Apartments – West Orange, NJ
Construction of a 5 story mid rise consisting of (65) affordable house and on-site parking lot
Crane’s Mill Town Center Porte Cochere & Façade Renovations- West Caldwell, NJ
Renovations to the Porte cochere & facade
Medford Leas Multiple Phased Project – Medford, NJ
New additions and repositing of existing campus totaling 120,000 S.F.
Teaneck Road Senior Housing Project – Teaneck, NJ
Construction of 40 new units of affordable housing and on-site parking garage
Bright Side Manor – Teaneck, NJ
Construction of new two-story addition on the southern portion of the site along with minor renovations to existing building
Princeton Community Village – Princeton, NJ
New (3) story affordable family apartment units
Heartis – Senior. Living. – Warminster, PA
Construction of 162,000 square foot of independent living, assisted living and memory care apartments. The community will feature large, secured courtyards and walking paths; beautifully landscaped grounds and gardens; game and activity rooms; a large dining room serving chef-prepared, home-cooked meals; ongoing social and recreational activities; a beauty parlor and barber shop; relaxing common areas; & luxurious finishes.
Manalapan Senior Living – Manalapan, NJ
Construction of 57,775 square foot one story assisted living facility. The assisted living facility will contain 60 residential units, common spaces and amenity spaces.
1830 Rittenhouse Square, Philadelphia, PA
Demolition of exterior balconies on the east elevation and replacing the existing concrete on metal deck with metal galvanized grating.
Winchester Gardens, Maplewood, NJ
Multi-phased project consisting of new assisted living additions, renovations to the existing healthcare, independent living apartments and common areas
Renaissance Healthcare – Philadelphia, PA
Interior alteration to occupied nursing home
Manchester Senior Housing HMFA #02941 – Whiting, NJ
Interior Renovations to existing apartments and Common Areas
Brookside Nursing & Rehabilitation Center – Roslyn, PA
Addition and renovations to existing healthcare facility
Wiley Christian Retirement Community – Marlton, NJ
Renovations to existing apartments and healthcare facility
Daughters of Israel – West Orange, NJ
Renovations to occupied facility
Brennan Robison
Senior Superintendent
PROFESSIONAL EXPERIENCE
- Bachelor of Science, Construction Management, 2020
- OSHA 30 Certified
PROFICIENT IN
• Procore
• Bluebeam
• REVIT
• Autodesk
• Microsoft Project
PROFESSIONAL EXPERIENCE
BIM Example
- Ensure all OSHA, C&C, and Site-Specific safety policies and procedures are in place and followed by all personnel and visitors entering the site.
- Creating & maintaining project schedules.
- Developing comprehensive logistics plans.
- Procurement of all necessary permits from local authorities.
- Oversight & coordination of all drawings & specification documents.
- Work with project team to complete submittals, shop drawings, and RFI’s in a timely manner to ensure there are no project delays.
- Managing project scope and changes.
- Setting goals and tracking project performance.
- Managing resources to achieve project objectives.
- Coordination with owners, design team, field staff, office support staff, subcontractors and local governing authorities to ensure projects are completed as scheduled.
- Provide project status reports and updates to Owners / Design Team.
- Finalize as-builts, close out documents, and final commissioning.
- Quality Control
PROFICIENT IN:
• Procore
• Bluebeam
• REVIT
• Autodesk
• Microsoft Project
PROFESSIONAL EXPERIENCE
C & C Construction Management Inc. Philadelphia, PA
- Procore
- Proplanner
- Microsoft Project
- Sharefile
- Bluebeam
- Fieldwire
- Bilingual
PROFESSIONAL EXPERIENCE
Responsibilities include:
CERTIFICATES & TRAINING
C & C C.M.I. Similar Projects
Click the project button to view project.
Heartis | Bucks County
Heartis – Senior Living
Warminster, PA
Construction of 162,000 square foot of independent living, assisted living and memory care apartments. The community will feature large, secured courtyards and walking paths; beautifully landscaped grounds and gardens; game and activity rooms; a large dining room serving chef-prepared, home-cooked meals; ongoing social and recreational activities; a beauty parlor and barber shop; relaxing common areas; & luxurious finishes GMP Project Owner: Caddis Partners, LLC Construction Type: I-2, R-2 & R-12 Contract: $36 Million Contract Date: March 2020 Additional Reference Upon RequestWinchester Gardens
Maplewood, NJ
Performed pre-construction services & general contract services for this multi-phased project consisting of new assisted living additions, renovations to the existing healthcare, independent living apartments and common areas
GMP Project
Owner: Springpoint Senior Living
Construction Type: I-2
Contract: $24.7 Million
Contract Date: September 2016
Reference:
Springpoint Senior Living
Anthony Argondizza
CEO
(732) 430-3671
The Atrium At Red Bank
Red Bank, NJ
This project included (140) senior living units throughout a 14-story tower and new 8-story mid-rise containing Independent Living, Memory Care and Skilled Nursing Units. The 8-story addition utilized a poured in place concrete structure method to match the floor heights of the existing adjacent 14-story tower. Our approach involved real-time curing results utilizing the Concrete Maturity Testing method which reduced the schedule and resulted in the project being nominated for the 50th Annual New Jersey Concrete Awards. The complete renovation of the 14-story occupied tower included a new four pipe hydronic HVAC system, fire alarm system and the removal and replacement of the complete exterior curtain wall system. To complete this work, a temporary insulated aluminum curtain wall including temporary heat and air conditioning units was constructed in each individual resident room from the 4th level to the 14th level to allow the residents to remain in their unit during construction. The 345’ waterfront bulkhead and dock on the Navesink River also required complete reconstruction as part of this project allowing the residents to take river cruises on the facility’s Pontoon boats. The new amenities for this (140) unit Senior Living Facility consist of Dining Venues, Library, Billiards, Salon, Fitness Area, Outside Gardens, Putting Green, and Resident Valet Parking Lot. GMP & NJDEP Project Owner: Springpoint Senior Living Construction Type: I-2 Contract: $50 MillionMedford Leas
Medford, NJ
New additions and repositing of existing campus totaling 120,000 S.F.
Owner: Medford Leas
Construction Type: IIB
Crane’s Mill
West Caldwell, NJ
Performed pre-construction services & general contract services for interior renovations to existing community’s town center of approximately 9,344 square feet. Currently working on interior renovations to lobby, vestibule and lounges.
GMP Project
Owner:Lutheran Social Ministries of New Jersey
Construction Type: R-2
Lillian Booth Actors Home
Englewood, NJ
New additions and renovations to existing occupied healthcare totaling 53,393 SF. New addition constructed with structural steel and composite concrete floor. Owner: Actors Fund Home Construction Type: I-2 Contract:$18.6 MillionReference:
Actors Fund Home – Englewood, NJ
Jordan Strohl
Administrator
(201) 871-8882
Technology
C&C combines our first-class personnel with the latest in construction innovation to deliver best-in-industry services. Our integration of modern technologies and processes allows for seamless communication, enhanced cost effectiveness and greater project efficiency. We strive to consistently innovate and adapt to get projects done on schedule and on budget.
BIM Modeling
Procore
Site Cameras
C & C uses site cameras for surveillance, capturing timelapse, as well as capturing video for each project. Site cameras also allow owners, and offsite workers to see live progress of the project.
Ground Improvement Technologies & Alternate Foundation Methods
360 Progress and walkthroughs
360 walkthroughs give both off site workers and owners a fully immersive walkthrough of the entire facility during construction. This technology allows C & C to see progress, make important decisions while offsite, and collaborate with all trades on current field conditions.